Proven on Site

A selection of steel structure, industrial, healthcare and infrastructure projects delivered by TAECO across the Kingdom of Saudi Arabia, together with the piping track record of our management team.

0

TAECO projects featured

0

EOT cranes installed (Riyadh, Jeddah, Dammam & Jubail)

0

Key clients listed

0m³/day

Jubail RO plant (team track record)

Industrial

Structural Steel Shed – Fabrication & Installation

  • ClientSahari Al-Khair
  • Project No.SAK-S0535

Initiated on 10 September 2023: fabrication and installation of a custom-designed single-module structural steel shed with a double-span roof (1/10 slope), 0.5 mm corrugated sheets and a 4 m × 4 m double door. Sandblasted with a single coat of epoxy primer; completed on time to the client’s specifications.

Length
30 m
Width
16 m
Eave height
5.51 m
Bays
5
Industrial

Gangway Structure

  • ClientShipcare Contracting Co.
  • Project No.JDH/23

Detailing, fabrication and erection of a gangway structure.

Industrial

Al Zamil Project

  • ClientAl Zamil Heavy Industries Ltd
  • Project No.25120106

Fabrication and erection works including fabrication and galvanizing of platforms, supports and staircases, custom sunshade assemblies, and the supply and assembly of platforms, ladders and steel frames.

Healthcare

Sign Board – King’s College London Hospital, Jeddah

  • ClientPrime Contracting Company
  • Project No.PM07

Sign board steel structure – scope including design, shop drawings, fabrication, supply and installation.

Healthcare

Solaiman Al Fakeeh Hospital, Madinah – Canopy Steel Structure

  • ClientPrime Elkhereiji Commerce & Contracting Co.
  • Project No.2512

Canopy steel structure – scope including design, shop drawings, fabrication, supply and installation.

Buildings

Pre-Cast Podium Frame Steel Structure

  • ClientPrime AFRINA Contracting Co.
  • Project No.A18125

Precast frame scope including design, shop drawings, fabrication, supply and installation of steel structure and post-fixed anchors at Tower 05 and Tower 13.

Healthcare

Mina Emergency Hospital Bridge

  • ClientAl Badeel Contracting
  • Project No.09122025

Scope including design, shop drawings, fabrication, supply and installation of the bridge steel structure, including metal deck and shear studs.

Buildings

Masar Diyar Haram-II – Office Hangar

  • ClientAfrina Construction (ACUD)
  • Project No.21062026

Scope including design, shop drawings, fabrication, supply and installation of steel structure, including roof and wall sandwich panels.

Buildings

Masar Diyar Haram-I – Spire

  • ClientAfrina Construction (ACUD)
  • Project No.092024

Scope including design, shop drawings, fabrication, supply and installation of steel structure with cladding at Tower 05 and Tower 13.

Industrial

Chiller Platform – Halwani Industries, Jeddah

  • ClientHalwani Industries

Designing, fabricating and erecting the chiller platform, exclusively designed and fabricated by the TAECO Steel products factory: heavy I-beams, gratings, handrails, angles, stiffeners and a caged ladder.

Fabrication & painting
4 days
Erection
3 hours
Infrastructure

King Abdulaziz International Airport (KAIA) Expansion

  • LocationJeddah

TAECO took part in this expansion project, one of the mega projects in Jeddah, and was responsible for designing, fabricating and erecting the steel structure shown.

Industrial

Saudi Cables Company, Jeddah

  • ClientSaudi Cables Company

Fiberglass insulation and aluminium cladding over galvanized tubes, delivered from scratch: taking dimensions, starting work on the material and progressing step by step to completion. The client expressed satisfaction with the quality and schedule.

Lines
2
Length per line
801 m
Cranes

Al Abniyah Precast Concrete Plant, Dammam

  • ClientAl Abniyah Precast Concrete

Installation of a 32-meter span, 25-ton overhead crane on the hangar – work that demands precision and concentration. TAECO has installed 80 EOT cranes of various capacities and spans in Riyadh, Jeddah, Dammam and Jubail.

Span
32 m
Capacity
25 t

In Progress

Ongoing Projects

AFRINA (ACUD)

  • Masar Makkah Project
  • Four Spires Project
  • Pre-Cast Frames (ABC)
  • Precast Frame (South Area)
  • DH-II Office Hangar

Al Zamil Heavy Industries Ltd

  • 02 projects for Aramco auxiliary steel structure

Trusted Relationships

Our Key Clients

We serve the local market and regularly receive various projects from the following key clients.

  1. 01King Abdulaziz International Airport (KAIA)Jeddah
  2. 02Saudi Aramco Mobil Refinery Company Ltd.Jeddah
  3. 03Saudi Basic Industries Corp (SABIC)Jeddah
  4. 04Saudi Telecom CompanyRiyadh
  5. 05Dallah Al-Baraka GroupJeddah
  6. 06National Industrialization Co. (Tasnee)Riyadh
  7. 07Almarai Co. Ltd.Riyadh
  8. 08Juffali GroupDammam
  9. 09Al Mabouli GroupDammam
  10. 10Saudi Binladin GroupJeddah
  11. 11Saudi Ready Mix Cement CompanyMakkah
  12. 12El Safwa CementJeddah
  13. 13Qassim CementMakkah
  14. 14Saudi Cables CompanyJeddah
  15. 15Saudi Concrete Product IndustriesJeddah
  16. 16National Trigeneration (CHP) CompanyRiyadh
  17. 17Al Naba Contracting EnterprisesJubail
  18. 18Industrial Ductile Iron Pipes CompanyJubail
  19. 19Arabian Petroleum Services Company (Apsco)Jeddah
  20. 20United Gulf SteelJubail
  21. 21Gulf Industrial Gratings CompanyJubail
  22. 22Allied Engineering EnterprisesJeddah
  23. 23Wintex IndustriesJeddah

Team Track Record

Track Record of Our New Management

Projects delivered by members of TAECO’s new management team in their previous roles.

Please note: these projects were executed before the team joined TAECO and are listed separately from TAECO’s own projects above. Details are reproduced as stated in the team’s project records and client letters.

Piping · Retrofitting · In Progress

Retrofitting of Chiller Plant – Masjid-e-Nabwi Al-Shareef, Madinah Munawwarah

  • OwnerMinistry of Finance K.S.A
  • ConsultantDAR
  • ClientsJohnson Controls, SBG
  • LocationHoly City of Madinah

Retrofitting operations carried out as a partner of Johnson Controls, involving retrofitting of piping, valves, acoustic panels, insulation and cladding, alignment, instrumentation and electrical works.

  • Retrofitting of interconnecting suction and discharge piping connected with compressors under 0.003 of an inch tolerance, for welding induced stresses, successfully achieved
  • 100% Radiographic Testing of all girth welds
  • Instrumentation and Controls protocols for 6 chiller units, successfully achieved
  • Thermal and Acoustic Insulation and Cladding with all Quality Control Protocols
  • Mechanical operations verified and approved by all governing authorities
Alignment tolerance
0.003 in
Radiography
100% girth welds
Chiller units
6
Piping · Super Duplex

Critical Installation of Super Duplex & Duplex Stainless Steel Piping – World’s Largest Desalination Plant, Jubail

  • OwnerSaudi Water Authority K.S.A
  • ConsultantPoyry, Switzerland
  • Main contractorSSEM
  • ClientMETITO K.S.A
  • LocationJubail, K.S.A

Erection and welding of super duplex and duplex stainless steel piping. All pipe weldments are accomplished by the manual GTAW welding process; the operating pressure in Pass-1 is around 120 BAR. The quality of the work was recognised and appreciated by SWA and Poyry, including an appreciation letter from the Saudi Water Authority (13 January 2026) for the RO-Jubail One Million Project.

Field welded joints
25,000 dia-inches
Joint-wise repair rate
less than 0.1%
Radiography
100% girth welds
Pass-1 pressure
~120 BAR

Pöyry performance certificate (14 Sep 2025) – RO1, RO2 & Chemical Dosing Area

MaterialWeld jointsRT repair jointsRepair %Dia-inches welded
Super Duplex SS65740.6%14,162.0
Duplex SS9600.0%576.0
Stainless Steel54410.2%1,023.0
Total1,29750.1%15,761.0
Piping · Carbon Steel

Installation of 11 Flow Meters – Chiller Plant, KAUST

  • LocationChiller plant, KAUST

Installation of 11 flow meters in the existing 20″ diameter carbon steel inlet piping system in the chiller plant, KAUST.

  • Cutting of the existing 20″ carbon steel inlet piping
  • Welding on the inlet piping for the flow meter installation
Flow meters
11
Line size
20″ CS
Piping · Super Duplex

Super Duplex & Duplex Stainless Steel Piping – R.O Plant, KAUST

  • ClientNesma United Industries
  • LocationKing Abdullah University of Science and Technology, Thuwwal
  • Purchase order2KAU11833 · 5 September 2021

Fabrication and erection of super duplex and duplex stainless steel piping in the R.O plant, including SWRO racks BV rectification works with fabrication and erection of new super duplex stainless steel grade A790/UNS No. S32750 piping. Job completion certificate issued by Nesma United Industries on 4 December 2022.

Material
A790 / UNS S32750
Piping · Integrity Assessment

Integrity Assessment of Duplex Stainless Steel Piping – Rack D, KAUST

  • ClientNESMA
  • LocationReverse Osmosis Plant, Utilities Area, King Abdullah University of Science and Technology (KAUST), Thuwal
  • Project No.2KAU09842

Integrity assessment of duplex stainless steel piping in the R.O plant at Rack D, KAUST, covering duplex stainless steel elbows and eccentric reducers conforming to ASTM A928 S2205, to report whether each component is safe for future serviceability. Assessment operations were conducted starting from process train D to C, B and A, respectively.

  • Ultrasonic thickness examination with a Krautkrämer USM 36 pulse-echo flaw detector, calibrated according to ASME Section V, Article 4
  • Calibration over a duplex stainless steel ASTM A928 S2205 NPS 10″ piece of 9.27 mm standard thickness
  • UT performed by personnel qualified and certified to Level II in Ultrasonic Testing (ANSI/ASNT CP-189)
  • Code calculations performed in accordance with ASME B31.3; components below the required minimum thickness were reported with a replacement recommendation
Material
ASTM A928 S2205
Method
UT thickness
Code
ASME B31.3
Reducers
14″ × 10″
Piping · Duplex SS

Duplex Stainless Steel Discharge Headers – R.O Plant, KAUST

  • ClientNesma United Industries
  • LocationKing Abdullah University of Science and Technology, Thuwwal
  • Purchase order2KAU09842 · 27 July 2019

Site fabrication, welding and erection of duplex stainless steel grade A-928/S2205 discharge headers in the Reverse Osmosis plant, following all the QHSE and documentation protocols specified by NESMA and KAUST Management, within the specified time period. Job completion certificate issued by Nesma United Industries on 4 December 2022.

Material
A-928 / S2205
Quality Documentation

Test Packages for 2 Power Plants (40MW) – Arabian Cement, Rabigh

  • ClientArabian Cement
  • SupervisionMAN Diesel and Turbo and KANOO group
  • LocationRabigh

Quality documentation assessment, completion of all testing protocols and completion of test packages (European Standard) for 2 power plants of 40MW for Arabian Cement, Rabigh.

Power plants
2 × 40MW
Standard
European
Industrial Equipment · Repair

Spruce Media Filter Vessels – R.O Plant, KAUST

  • LocationR.O Plant, KAUST

Repairing and modification of Spruce Media Filter vessels in the R.O Plant, KAUST.

  • Inspection of corroded openings in the vessel walls
  • Welded repair patches installed inside the vessels
  • Dye penetrant testing (DPT) of the repaired areas
  • Ultrasonic testing (UT) inside the vessels
NDT
DPT · UT
Industrial Equipment · Repair

Cracked Evaporator No. 3 – Chiller Plant, KAUST

  • LocationChiller Plant, KAUST

Repairing and modification of cracked Evaporator no. 3 in the Chiller Plant, KAUST. On opening the bottom shell plate of the evaporator to install additional supports to the vessel’s internal bottom plate, heavy cracking was observed in the internal plate, extending to large lengths, including cracking in previously patched plates. Positive material identification (PMI) of the defected plate and its weldments was carried out by a third party, and the repair was executed in the following steps:

  • Step 1 – Cutting the shell
  • Step 2 – Visual inspection of the cracked plate
  • Step 3 – Dye penetrant testing (DPT) of the internal plate
  • Step 4 – Cutting of the internal plate
  • Step 5 – Welding of the internal plate, reinforcement and DPT
  • Step 6 – Outer shell plate bending and hole
  • Step 7 – Final fit-up and shell welding
NDT
VT · DPT · PMI
Repair steps
7
Mechanical · Installation & Commissioning

Sodium Hypochlorite Units – Marafiq-1, Yanbu

  • ClientAdvanced Triad Turbine Services Co. Ltd. (ATTS)
  • ProjectSupply and Installation of Hypochlorite Generators and Headers – Yanbu
  • Work orderPO#19-081-Rev01
  • Work period24/06/2019 – 31/12/2021

Complete dismantling of the old 8 sodium hypochlorite units and complete installation of new hypochlorite units in Marafiq-1, Yanbu, with all accessories and equipment, inclusive of GRP, CPVC and HDPE piping. The work completion certificate covers dismantling, installation, testing and commissioning of eight Monopolar HS100 SF sodium hypochlorite units.

Units
8
Piping
GRP · CPVC · HDPE